Waiting for concrete

Progress continued as the crew finished off the tower villa forming and steel work.  They finished the week by applying the sealant to the cistern wall and back filling with excavated fill dirt. [caption id="attachment_2588" align="alignnone" width="4032"]img_1132 Cistern sealed and backfilled[/caption] Wayne also excavated the parking area for the upper 1BR villa. [caption id="attachment_2590" align="alignnone" width="4032"]img_1154 Excavation of the parking area for the 1BR Villa[/caption] The crew then formed the footings upon which the southern end of the floor slab will be anchored. [caption id="attachment_2591" align="alignnone" width="4032"]img_1155 Footings formed for southern end of villa[/caption] Looks like a nice week ahead.  We're scheduled for a pour on the 12th which will allow us to advance the pace as we continue the wait for concrete... img_1118 Have a great week everyone! We've had a visitor who's been quite interested in our family over the last few weeks.  He's been more and more inquisitive.   I'm sure he's wondering what K.D. is all about. [caption id="attachment_2606" align="aligncenter" width="2665"]img_1128 Our little friend checking K.D. out[/caption]