Double Rainbow!

As I was sitting down to write this week's entry, a rain cloud passed through the valley and the sun was in a cooperative mood.  The rainbow seemed to be leading the misty rain as it moved through the valley in front of our home on Mamey Peak. FullSizeRender_1 Before I go into the update, I just have to be the oversharing grandfather and show this little clip of Cami at Francis Bay. [wpvideo hHlc76Ay] Now, after a dose of cuteness, your weekly dose of construction updates.  It's been too rainy for the last few weeks to do the TotalWall finish on the entire Tower Villa.  Since the balcony is cantilevered and protected, the plaster guys did finish up the underneath portion of the villa. FullSizeRender_20 This will be the finished look and color.  "Oyster White" by Sherwin Williams. FullSizeRender_18 Even the view from under the balcony is pretty nice. FullSizeRender_17 They tile guys have been busy as they finished off the Tower Villa's rooftop terrace, the observation tower platform and the stairs to the viewing platform. FullSizeRender_8 Now this is a view. FullSizeRender_7 The rooftop terrace is looking good. FullSizeRender_6 The tile is also looking good in the Tower Villa balcony and main living area. FullSizeRender_15FullSizeRender_14FullSizeRender_13 Nancy applied her cleaning skills to the wine cellar.  With an individual, dedicated A/C unit, David's vino will stay chill. FullSizeRender_11 Larry, our terrific cabinet maker, sent us some pics of a prototype bed for the bedrooms.  We're making the side tables a few inches thinner to achieve a better balance, but this is pretty much the design.   The final product will be constructed using Khaya Mahogany, with a light stain and clear finish. [gallery ids="5335,5334" type="rectangular"] While most of the action has been on the lower section of the site, the two Poolside Villas continue to move toward window and door completion.  The plumbing is almost complete for Poolside Villa #1. FullSizeRender_24 Poolside Villa #2 ready for doors and windows with AC installed. FullSizeRender_21 The lower 1BR Honeymoon suite is coming along nicely with a pour scheduled a week from Tuesday. FullSizeRender_4 The view is, of course, epic. FullSizeRender_3 The office and laundry facility are in the three week holding period for suspended slab curing, but most of the plyform has already been removed from the walls. FullSizeRender_2 Instead of a single Cami photo, this week you get a Cami-collage. [gallery ids="5338,5337,5333,5332,5331" type="rectangular"] Have a great week everyone!