Rain in the forecast...

We have a pretty good storm heading our way on Wednesday, so this week we'll be focused on battening down the hatches, then looking forward again, this weekend.  The "C" team, Conner, Charlotte and Cameron took off for Texas on Saturday from Puerto Rico, and Cameron gets to spend some quality time with our co-grandparents!  We'll miss this little one! [gallery ids="5859,5861" type="rectangular"] The Tower Villa is moving forward with internal plaster work. [caption id="attachment_5846" align="aligncenter" width="640"]FullSizeRender_10 Final plaster coat applied in the Tower Villa[/caption] [caption id="attachment_5845" align="aligncenter" width="480"]FullSizeRender_9 Ready for interior doors[/caption] The team also stripped the forms from the main entrance and the steps to poolside villa #1. [caption id="attachment_5852" align="aligncenter" width="480"]FullSizeRender_16 Retaining wall for main drive[/caption] [caption id="attachment_5851" align="aligncenter" width="640"]FullSizeRender_15 Entryway and steps [/caption] The entryway to poolside Villa #1 is looking good! [caption id="attachment_5850" align="alignnone" width="640"]FullSizeRender_14 Retaining wall and planter area in front of Poolside Villa #1[/caption] Now we're ready to get the final concrete pours on the pool decking and get it tiled and plastered.  As I walked between the two poolside villas, I got a nice view of the underside of the balcony of villa #2.  The color of the TotalWall is perfect. FullSizeRender_11 Fernando and Pena were working on finishing off the plumbing of the pool patio in preparation for a pour on the 11th. [caption id="attachment_5849" align="aligncenter" width="640"]FullSizeRender_13 Pena and Fernando finishing off the plumbing for the pool area[/caption] Wayne has back filled the support walls, and the main floor of the pool area will be ready for steel in a few more days. FullSizeRender_12 The upper 1BR villa is fully wired and will be ready for plaster once the Tower Villa is finished with its interior plaster. [caption id="attachment_5838" align="aligncenter" width="640"]FullSizeRender_2 Upper 1BR ready for TotalWall[/caption] The interior of the 1BR is almost ready for plastering. [caption id="attachment_5841" align="aligncenter" width="480"]FullSizeRender_5 Kitchen ready for plaster[/caption] [caption id="attachment_5842" align="aligncenter" width="640"]FullSizeRender_6 A bit more Durock and plaster![/caption] Ok, wish us a bit of rain but no more this week!  Here's some Cameron cheer to start your week. [caption id="attachment_5858" align="aligncenter" width="640"]IMG_4377 Selfie with the old guy[/caption] [caption id="attachment_5860" align="aligncenter" width="720"]IMG_4388 Cameron heading to Puerto Rico with Cam and Brooke on the pad[/caption] Went to St. Thomas on Friday... the girls had a spa day! [caption id="attachment_5856" align="aligncenter" width="480"]FullSizeRender (2) KD and Ting after their spa day[/caption] Have a great week everyone!